Home – Version B
JV Driver is a leader in Crypto Facilities
Plug and Play Crypto Mining Facilities
We’ve assisted in the deployment of over 500 Petahash of computing power in the last year.
JVDF has established itself as leaders in the design, engineering, supply chain, fabrication and deployment of mobile data centers currently used in cryptocurrency mining operations.
Mobile mining units that have the scale of a full-size data center allow for easy access to the network. Mining can be readily purchased at Petahash scale with a complete self-contained mining solution, including easy set-up, requiring only a suitable location with an affordable power source and internet access.
JV Driver is a leader in Crypto Facilities
Plug and Play Crypto Mining Facilities
We’ve assisted in the deployment of over 500 Petahash of computing power in the last
JVDF has established itself as leaders in the design, engineering, supply chain, fabrication and deployment of mobile data centers currently used in cryptocurrency mining operations.
Mobile mining units that have the scale of a full-size data center allow for easy access to the network. Mining can be readily purchased at Petahash scale with a complete self-contained mining solution, including easy set-up, requiring only a suitable location with an affordable power source and internet access.
Find out why Canada is the best place in the world to mine cryptocurrencies.
[us_btn link=”url:http%3A%2F%2Fdevelopment.sociallitetester.com%2Funcategorized%2Fblockchain-update-why-canada-is-the-next-big-spot-for-cryptocurrency-mining%2F|||” align=”center” el_class=”popup-price-guide” style=”3″ label=”Learn More” font_size=”15px”]The Basis for our Success
Customizable
Our server racking is built from laser cut, CNC formed and riveted sheet metal. This structure can be fabricated anywhere starting from 20’ up to 53’ long with up to 9 Petahash mining power – per structure.
Cost Effective
JV Driver has full control over the production and scheduling for all aspects of the work. Our simple, focused, highly accountable, and cost effective project oversight makes us the ideal “Single Site, Single Source” supplier.
Easy To Use
Our self-contained mining solution is designed to be safe, secure and easy to set-up, requiring only a suitable location with an affordable power source and internet access. Ready to ship in 8 weeks.
The Basis for our Success
Fully Customizable
Our server racking is built from laser cut, CNC formed and riveted sheet metal. This structure can be fabricated anywhere from 20’ up to 53’ long with up to 9 Petahash mining power – per structure.
Cost Effective
JV Driver has full control over the production and scheduling for all aspects of the work. Our simple, focused, highly accountable, and cost effective project oversight makes us the ideal “Single Site, Single Source” supplier.
Easy To Use
Our self-contained mining solution is designed to be safe, secure and easy to set-up, requiring only a suitable location with an affordable power source and internet access. Ready to ship in 8 weeks.
Projects Gallery
Projects Gallery
ENTERPRISES OF THE JV DRIVER GROUP
[us_separator height=”20px” size=”custom”][us_grid columns=”8″ post_type=”attachment” items_quantity=”” items_gap=”” items_valign=”1″ type=”carousel” img_size=”medium” images=”438,431,437,436,435,434,433,432″ items_layout=”899″][us_separator height=”60px” size=”custom”]OUR LOCATIONS
[us_separator size=”custom” height=”32px”]
Vancouver
Surrey
Burnaby
Pasedena
Prince George
Edmonton
Calgary
Baton Rouge
Montreal
Newfoundland
Phoenix
Lake Charles
Houston
Toronto
Nisku
Barbados