Peace River, Alberta
The assignment
The Carmon Creek scope included three Siemens SGT6-5000F gas turbines, rated at 230 MW each, and three heat recovery steam generators. The installation was completed and passed all QC inspections for use. JV Driver worked within an integrated team with Shell and executed approximately $400 million of scope under the project’s largest award. The development was subsequently stopped. The 690 MW figure describes planned project capacity, not commissioned operating output.
Scope of work
- Gas-turbine and heat recovery steam-generator installation
- Integrated civil, structural, mechanical, piping, electrical and instrumentation scope
- Installation QC inspections passed for use
Delivery experience
The 2015 project thank-you presentation records 1.1 million work hours by JV Driver and its subcontractors without a recordable incident, more than 100 engineered crane lifts and over 2,500 welds without a failure. It also records the project’s 2015 Chief Executive Officer’s HSSE & SP Award for Improving HSSE Performance in a Global Risk Area. These are results reported for that project period.