FABRICATION & MODULE DELIVERY

Built off site.
Connected in the field.

Steel, piping, modules and logistics planned around the installation sequence.

Shell Albian pump houses · historical modular construction.

FROM DESIGN INTERFACES TO INSTALLATION

Treat the module as part of the whole project.

Off-site construction depends on more than shop capacity. Equipment, piping, structure, electrical systems and transport need to arrive at the workfront in the right sequence. JV Driver’s project history includes module fabrication, reassembly, testing, transportation and field installation, with responsibilities defined around each assignment.

The work between the shop and the site.

01

Define the package

Align design interfaces, equipment requirements, fabrication boundaries and the site installation sequence.

02

Assemble and test

Coordinate structural steel, pipe spools, electrical systems and hydrotesting within the agreed module scope.

Explore Kearl module assembly
04

Complete the interfaces

Manage field connections, inspection records and commissioning support as part of the overall construction program.

Explore pump-house delivery

SELECTED PROJECTS

Three different modular-delivery assignments.

Browse this segment
Kearl Lake Module Assembly · historical project photograph.
Kearl Lake Module Assembly · historical project photograph.

Historical project experience

Nisku, Alberta

Kearl Lake Module Assembly

Large-scale module reassembly, testing and logistics connecting fabrication yards with the Kearl development.

Read the project story
Shell Albian Pump Houses · historical project photograph.
Shell Albian Pump Houses · historical project photograph.

Historical project experience

Fort McMurray, Alberta

Shell Albian Pump Houses

Engineering through fabrication and transportation of three integrated pump-house modules.

Read the project story
Kearl slurry preparation · historical assembly and lifting photograph.
Kearl slurry preparation · historical assembly and lifting photograph.

CONSTRUCTABILITY

Make installation decisions before the lift.

At Kearl’s slurry-preparation plant and conveyor assignment, modularization and ground-level preassembly reduced work at height. At Jackpine, in-house fabrication connected extraction modules, pump houses and froth modules with a major field-construction program.

Explore Kearl field execution