
Historical project experience
Fort McKay, Alberta
CNRL Horizon Hydrogen Plant
General-contractor delivery of the reformer, compression and supporting hydrogen-plant infrastructure.
Read the project storyOUR DELIVERY HISTORY
From mill systems and process piping to major industrial facilities, operating support and Nation-led priorities.
A RECORD OF PRACTICAL WORK
JV Driver’s history reaches back to industrial work in 1989. The record includes small but critical plant changes alongside major capital construction: foundations, piping, pressure systems, turbines, process equipment and the work required to keep existing facilities moving. Selected examples below show how that experience developed.
SELECTED MILESTONES
1989–1994
The 2008 work-history list records digester rebuilding, boiler foundations, piping tie-ins, water and effluent systems, and shutdown work in British Columbia. These assignments established practical experience at the interfaces between construction and plant operation.
Explore this experience1996–1999
Finlay cogeneration combined a wood-waste boiler, turbine and fuel handling. At McArthur River, the English River Constructors joint venture delivered a slurry loadout facility through winter conditions.
Explore this experience2004–2006
Bear Creek, CG&E EcoPower, Prince George, Grande Prairie and Kamloops connected generation and steam systems with fibreline, digester and production upgrades.
Explore this experience2008–2010
Horizon extraction and hydrogen work, Shell Albian/Jackpine and Mosaic’s potash expansions drew on civil, structural, mechanical, piping, electrical and instrumentation experience.
Explore this experience2011–2015
ALPAC, Kearl module assembly, Shell pump houses, Nabiye and JACOS linked fabrication with site execution. Carmon Creek’s installation and QC acceptance remain distinguished from an operating generating facility.
Explore this experience2017
The Lehigh grinding-capacity addition brought a vertical roller mill and associated systems into an existing cement operation, with commissioning support and coordination across contractor interfaces.
Explore this experience2024–2025
Frog Lake and Piikani reports document owner-side oversight, local engagement, business-capacity support and closeout advice. These add a different kind of project contribution to the construction record.
Explore this experienceSelected examples from supplied project profiles and the 1989–2008 work-history list. This is not a complete contract register or a statement of current client contracts.
SELECTED PROJECTS

Historical project experience
Fort McKay, Alberta
General-contractor delivery of the reformer, compression and supporting hydrogen-plant infrastructure.
Read the project story
Extraction and tailings construction
Fort McMurray, Alberta
General-contractor delivery of multidisciplinary extraction and tailings facilities within the Albian expansion.
Read the project storySELECTED PROJECTS

Historical project experience
Vancouver Island & Powell River, British Columbia
Civil and mechanical maintenance across a four-mill system, from pressure parts to finishing equipment.
Read the project story
Maintenance project experience
NORMAN WELLS · NORTHWEST TERRITORIES
Maintenance, turnarounds and site support in an Arctic operating environment, with local Indigenous subcontractors playing an important part in delivery.
Read the project storyExplore the separate owner-side, enterprise and local-engagement services documented in the Frog Lake and Piikani reports.
The 1989–2008 register adds specific pipeline, mill, process-plant, treatment-system and shutdown assignments.
LET’S GET TO WORK
Tell us what you need to build, improve or maintain.