Historical project experience

CG&E EcoPower Cogeneration

Biomass-fuelled generation combining a turbine, boilers, fuel handling and balance-of-plant construction.

CG&E EcoPower Cogeneration · historical project photograph.

Grande Prairie, Alberta

The assignment

JV Driver’s construction scope at CG&E EcoPower surrounded a 25 MW turbine and the hog-fuel handling and storage facilities. The installation included two combustors, two boilers, an economizer, an air-cooled condenser and supporting equipment. JV Driver self-performed civil, mechanical, structural and electrical work and managed the instrumentation subcontract.

Scope of work

  • Turbine and supplementary equipment installation
  • Hog-fuel handling and fuel storage
  • Civil, structural, mechanical and electrical construction
  • Large- and small-bore piping, including P11 and P91 chrome-moly

Delivery experience

Constructability review led to a redesign of the hog-fuel truck dump using precast concrete. The project profile credits that change with removing approximately four weeks from the schedule. This is a specific example of engineering-stage input improving field delivery.

RELATED ASSIGNMENTS

Biomass and industrial cogeneration.

Browse this segment
TransCanada Bear Creek · facility reference photograph.
TransCanada Bear Creek · facility reference photograph.

Industrial cogeneration

Grande Prairie, Alberta

TransCanada Bear Creek

Foundations, underground services and steam-system connections for industrial cogeneration.

Read the project story

LET’S GET TO WORK

Bring us your next challenge.

Tell us what you need to build, improve or maintain.

Discuss your project