Historical project experience

Devon Jackfish SAGD

Construction and heavy lifts for a 35,000-barrel-per-day SAGD development.

Devon Jackfish SAGD · historical project photograph.

Conklin, Alberta

The assignment

JV Driver delivered construction for Devon’s Jackfish project, self-performing the civil, structural, piping and mechanical scope. The work included rigging studies and installation of large modules and vessels using a 300-ton crane with a maximizer. Constructability reviews during engineering informed how foundations, structures and equipment would be built and installed.

Scope of work

  • Civil foundations and structural erection
  • Piping and mechanical construction
  • Rigging studies, module and vessel installation
  • Engineering-stage constructability input

Delivery experience

The project profile describes the use of a specialized form system developed through constructability review to reduce cost and protect the schedule. Electrical and instrumentation were outside the self-performed scope.

RELATED ASSIGNMENTS

SAGD and steam-facility construction.

Browse this segment
JACOS Hangingstone · historical construction photograph.
JACOS Hangingstone · historical construction photograph.

Multidiscipline construction

Fort McMurray region, Alberta

JACOS Hangingstone

Fabrication, modules and site construction for an industrial SAGD development.

Read the project story
Imperial Oil Nabiye · heavy-lift installation work.
Imperial Oil Nabiye · heavy-lift installation work.

Power and steam construction

Cold Lake, Alberta

Imperial Oil Nabiye

Prime-contractor delivery connecting steam generation, bitumen processing and water treatment.

Read the project story