Prince George, British Columbia
The assignment
The UNBC assignment comprised two integrated projects: a building for Nexterra bioenergy equipment and an upgrade to the university’s heating and cooling infrastructure loop. The equipment converts wood waste into syngas for the boilers. Infrastructure work included replacing existing plastic hot- and cold-water lines with carbon steel, with work both inside buildings and across the campus.
Scope of work
- Budgeting, tendering and procurement
- BioEnergy building construction management
- Exterior and interior utility-loop work
- Coordination through construction completion
