The assignment

The Phase 1 expansion at Mosaic Belle Plaine was designed to increase water availability to the mine field for solution mining. JV Driver’s scope connected saltwater disposal wells, a reclaim-brine pump house, a powerhouse and a process-water building. The work included raw- and hot-water storage tanks, package-boiler installation and a 138 kV substation, bringing utility infrastructure together around the mine’s process needs.

Scope of work

  • Piling, civil and structural work
  • Mechanical, piping, electrical and instrumentation
  • Package boiler, process-water tanks and brine pumping
  • Cladding, constructability, purchasing and expediting

RELATED ASSIGNMENTS

Defined mine-infrastructure scopes.

Browse this segment
McArthur River Slurry Loadout · historical project photograph.
McArthur River Slurry Loadout · historical project photograph.

Historical project experience

Northern Saskatchewan

McArthur River Slurry Loadout

Joint-venture construction of a uranium slurry loadout facility through demanding winter conditions.