CASTLEGAR · BRITISH COLUMBIA
The assignment
For the Zellstoff Celgar Green Energy Project, JV Driver installed a 48 MW condensing turbine-generator and associated piping. The work also included high-voltage cabling, switchgear, power and control cabling, distributed control systems and commissioning support. Turbine commissioning began in September 2010.
Scope of work
- Condensing turbine-generator and associated mechanical systems
- High-voltage cabling, switchgear and electrical terminations
- Distributed controls and commissioning support