Green Power Project

Location: Prince George, B.C.

Client: Canfor

Prince George Green Power Project was a mill upgrade to produce electrical power using a steam turbine generator.

We acted as general contractor for this project, which included civil, mechanical, structural, and architectural aspects. Specifically, the project required numerous plant upgrades and the scope of work included structural supply and erection, equipment foundation demolition and installation, mechanical and piping supply and installation. This project also entailed the installation of a recovery boiler, concentrator equipment and upgrades to the existing evaporator system.