Kearl Lake Modules
Location: Ft. McMurray, AB
Client: Imperial Oil
Our team was awarded the Reassembly of 77 Fully Welded Korean Built process modules destined for Imperial Oil’s Kearl Lake Project. JV Drivers scope of work included fabrication and install of Miscellaneous Structural, Fabrication and Installation Miscellaneous Piping, Electrical and Instrumentation, Electrical Heat Tracing, Cladding, insulation, HVAC, Hydrotesting and Pre-Commissioning testing on Electrical and instrumentation and Scaffolding.
The projects peaked at 1200 workers with over 1.8 million man-hours, with no Lost Time Accidents.