Cruise Ship Pier
In a joint venture with Belvedere Place Contracting and Meridian Construction, JVD International completed this design/build pier expansion in Tortola, British Virgin Islands. This project included dredging Road Town harbor to 40 feet and lengthening and widening the existing cruise ship pier to accommodate larger and more modern cruise ships. The team retained BEA Architects…
Read MoreClayburn Substation
Scope of the project included all site preparation, civil, electrical work and the installation of 2 new transformers for the 69kv Compact Substation. The work included expansion of the substation yard and pile supported concrete foundations for the various electrical equipment.
Read MoreConifex Co-Gen
This Cogeneration project included localized demo of older portions of the pulp mill to allow for installation of new Co-Gen. The team was responsible for the installation of a new 36 MW generator and turbine and the supply and install of all required piping .
Read MoreHydroelectric Project
Skookum Creek hydroelectric project is a 25 megawatt (MW), run-of-river project located approximately 70 km north of Vancouver and 12 km east of Squamish, BC in the Sea to Sky corridor. The project will generate 88,000 megawatt-hours per year of clean, renewable electricity, or enough electricity to power approximately 8,300 homes. The project is located…
Read MoreContainer Terminal
We are about to begin work on a $110MM inland truck container terminal for the Government of Ghana in partnership with the Government of Canada through their Canadian Commercial Corporation.
Read MoreAirport Expansion
The Phase I and II expansion was composed of an airport runway extension, runway widening and resurfacing, drainage improvements and electrical modifications. Scope included 220,000 m3 of excavation; geo-grid and fabric; 4,510 lm of storm drainage and sub-drains; 72 manholes; concrete encased CMP pipes, 586,000 tonnes of granular fill; 136,000 tonnes of crush gravel; 52,000…
Read MoreCameron Street Bridge
Completed in 2009, this 15 month project saw the construction of 4-span, 187 metre, steel girder, 2 land bridge. the turnkey scope included the demolition of the old bridge.
Read MoreInternational Airport
IDL Projects Inc completed the Rehabilitation of the Sangster International Airport Runway, through a joint venture that included Surrey Paving and Aggregate Co. Ltd., Belvedere Place Developments Ltd. and IDL Projects Inc. – forming SBI JV Ltd. for the completion of the rehabilitation work. The project was successfully completed in 2013, funding for the work…