Location: Abbotsford B.C.

Client: Pacific Electrical Installations

The Mission project was an electrical transmission line scope of work that included foundations for 4 new Fraser River Crossing towers on the Abbotsford to Mission 69kv double circuit Transmission Line. Foundations consist of 30 meter piles and reinforced concrete pile caps.