Skip to content

BioEnergy Project

Location: Prince George, B.C.

Client: UNBC

Construction Management At Risk for the construction of two separate but integrated projects. One of the projects is a LEED Gold BioEnergy Building. The BioEnergy Building will house the bioenergy equipment supplied by Nexterra. Nexterra’s equipment converts wood waste into syngas burned in the boilers that are used to heat the entire UNBC facility. The anticipated natural gas use reduction from existing levels is 80%. The second project is the Infrastructure Loop upgrade to existing UNBC hot and cold water heating and cooling lines. Infrastructure Loop work includes upgrade of existing hot and cold water heating and cooling lines throughout the University. Infrastructure work includes both exterior and interior works. IDL is charged with all budgeting, tendering, procurement and construction to completion. Work starts as Construction Management and then converts to guarantee lump sum contract.

Scroll To Top