Firebag 3

Location: Ft. McMurray, AB

Client: Suncor

Firebag utilizes in-situ production, steam-assisted gravity drainage (SAGD), at their Northern Alberta facility. Firebag 3 is the third phase of expansion for the Firebag operation, producing up to 68,000 barrels per day.

Our team participated in the DSU Flash Chemical Unit, for the Suncor Firebag 3 expansion. This scope of work was composed of 28 Process Modules. The project consisted of assembly and erection, including the installation of multiple vessels weighing in excess of 120,000lbs.