Skip to content

Highland Valley Copper

Location: Logan Lake, B.C.

Client: Teck

In a joint venture with Fluor Canada, JV Driver Group completed a construction contract for Highland Valley Copper which has an open pit copper molybdenum facility at Logan Lake. The scope included the installation of a new pebble crushing facility, upgrades in the existing grinding building, a new floatation facility, upgrades to the existing regent area and a new 138KV transformer. The project had a crew of between 700-900 with over 1,000,000 direct man-hours, consisting of civil, structural, mechanical, piping and electrical disciplines.

Scroll To Top