Horizon Extraction

Location: Ft.McKay, AB

Client: CNRL

JV Driver completed the CNRL Extraction Plant which consisted of 2 primary separation cells, flotation cells, 20 pipe rack modules, hot water facility, electrical substation, and emergency dump sump.

We were involved in this project from the early stages of development providing constructability support, labour strategies and construction services. Our scope was as the general contractor, providing civil, structural, piping and mechanical services. We also provided the off-site fabrication and module assembly for this project. JV Driver’s scope included over 1,000,000 craft man-hours.

Having been involved with the entire scope of work, JV Driver was engaged for the entire 4-year life of the project, during that time there were no changes in the Productivity Units. To add to the success, JV Driver was the first to turn over a silo for commissioning, and did so with no rework and a weld repair of less than 1%. The project was completed on time and on schedule with no Lost Time Incidents.

Scroll To Top