Kearl Lake
Location: Fort McMurray, AB
Client: Krupp Canada
JV Driver completed the Structural and Mechanical erection of the Slurry Prep Plant and the OPP Conveyor System for the Crusher and Surge Bin at Imperial Oil’s Kearl Lake facility. The 4 story structure is a 64,200 square foot plant with a 0.7 km conveyor line. JV Driver’s scope included piping, mechanical, civil and structural work. The project incorporated over 30,000 inches of pipe of varying commodities and 1,900 tonnes of structural steel.