Skip to content

Module Installation

Location: Point Comfort, TX

Client: Formosa Plastics Corporation

We completed the installation of 28 completed modules at the Formosa Plastics facility in Point Comfort, Texas. As part of this scope, JVDIS received the 28 completed modules from three (3) ships arriving at Calhoun Port Authority and then transported the modules to a staging area located near the port. From the staging area the modules were transported to the Formosa Plastics facility and installed. Prior to receiving the modules, JVDIS completed the survey, earthworks, caisson piles, pile caps and structural steel.

Scroll To Top