Nabiye
Location: Cold Lake, AB
Client: Imperial Oil
Our team was awarded a total of 41 modules (35 Piperacks, 6 Equipment modules with fully welded structural bases). This work included 290,000” of pipe welding and 2200 MT of steel fabrication. JV Driver was responsible for all pipe and steel fabrication, module assembly and site installation.