Turbine and Generator

Location: Athabasca, AB

Client: Alberta Pacific Forest Ltd.

JV Driver completed the installation of a 35 MW steam turbine and generator. The civil, concrete and mechanical scope included piers and pier caps, floor slabs with approximately 120 tons of rebar, steam piping and installation of an air condensing cooler, the generator and turbine. The project incorporated over 20,000 inches of pipe.