![](https://jvdriver.com/wp-content/uploads/2015/01/Williams-Redwater-Construction-800x800.jpg)
Williams Deethanizer
Location: Redwater, AB
Client: Williams Energy
The turnkey scope included fabrication of over 40 modules, a 5 day turnaround in the existing plant and new construction that included the installation of over 750 piles and the setting of the modules.