Skip to content

Horizon Recovery Plant

Our team has completed the Horizon Recovery Plant and CO2 Recovery Unit Modules for Air Liquide. The project included 20 modules, including both piperack and mechanical modules. The team was responsible for over 380 MT of steel fabrication and 5200 LM of pipe.

Read More

Nabiye

Our team was awarded a total of 41 modules (35 Piperacks, 6 Equipment modules with fully welded structural bases). This work included 290,000” of pipe welding and 2200 MT of steel fabrication. JV Driver was responsible for all pipe and steel fabrication, module assembly and site installation.

Read More

Kearl Lake Modules

Our team was awarded the Reassembly of 77 Fully Welded Korean Built process modules destined for Imperial Oil’s Kearl Lake Project. JV Drivers scope of work included fabrication and install of Miscellaneous Structural, Fabrication and Installation Miscellaneous Piping, Electrical and Instrumentation, Electrical Heat Tracing, Cladding, insulation, HVAC, Hydrotesting and Pre-Commissioning testing on Electrical and instrumentation…

Read More

Shell Pump Houses

Our team was awarded 3 Pump houses measuring 18 meters in length by 7 meters in width and 7.4 meters high. our scope of work included engineering, procurement, fabrication, module construction, transportation and commissioning support. This project also involved 9000 inches of pipe. The mechanical equipment used HVAC, 3000 HP GIW pumps, 30HP Gland water…

Read More

Sobeys Steel

Our team completed 55 tons of steel fabrication for the new Sobeys Storefront in Sherwood Park Alberta. The project was completed on schedule, meeting all quality specification and with excellent safety performance.

Read More

Firebag 3

Firebag utilizes in-situ production, steam-assisted gravity drainage (SAGD), at their Northern Alberta facility. Firebag 3 is the third phase of expansion for the Firebag operation, producing up to 68,000 barrels per day. Our team participated in the DSU Flash Chemical Unit, for the Suncor Firebag 3 expansion. This scope of work was composed of 28…

Read More

Walmart Steel

Our team completed 25 tons of steel fabrication for the new Walmart Medicine Hat Alberta. The project was completed on schedule, meeting all quality specification and with excellent safety performance.

Read More

Jackfish SAGD

Our team provided complete services from EDS constructability through mechanical completion. The services provided also included the completion and installation of 16 Modules and over 60,000 inches of Pipe Fabrication.

Read More

Keg Steel Fabrication

Our team completed 45 tons of steel fabrication for the new Keg Steakhouse in the beautiful Windemere neighborhood in Edmonton Alberta. The project was completed on schedule, meeting all quality specification and with excellent safety performance.

Read More

CNRL Horizon

Our team completed the pipe fabrication and module construction for all aspects of the Horizon Extraction Plant. The scope consisted of 28 Modules and over 120,000 inches of Pipe Fabrication.

Read More
Scroll To Top