Skip to content

Uranium Mine

In a joint venture with English River Constructors, JV Driver Group built the Uranium Slurry Loadout Facility for Cameco Corporation. Using JV Driver Group innovative labour strategies was key to the success of this project. The facility included the largest pachuca tanks ever built in Canada and a 100’ high concrete containment wall that was…

Read More

Shell Albian Sands

The AOSP Expansion project was a $4B dollar expansion of the existing Shell Albian facility. It included the Jackpine Mine, new extraction, tailings, froth and utilities facilities. Phase 1 ran from Q3 2006 to Q2 2010. We were the general contractor for the extraction and tailings portion of this project and was responsible for the completion…

Read More

Belle Plaine Expansion

JV Driver was awarded the Phase 1 Expansion to the Belle Plaine facility. The primary purpose of the expansion is to increase the water availability to the mine field in order to allow further solution mining. The award included the following scope: Two Salt Water Disposal Wells. Our scope is the piling, civil, piping, mechanical,…

Read More

K2 Mine Expansion

We constructed the Compactor Building for the Esterhazy K2 Mine Expansion. Our scope for the 9-story structure included the piping, mechanical, chutes, ducting and a portion of the structural steel. The project incorporated over 3,000 ft. of pipe. The mechanical equipment included multiple drag chain conveyors and elevators. In addition to the construction scope of…

Read More

Highland Valley Copper

In a joint venture with Fluor Canada, JV Driver Group completed a construction contract for Highland Valley Copper which has an open pit copper molybdenum facility at Logan Lake. The scope included the installation of a new pebble crushing facility, upgrades in the existing grinding building, a new floatation facility, upgrades to the existing regent…

Read More
Scroll To Top