Green Power Project
Prince George Green Power Project was a mill upgrade to produce electrical power using a steam turbine generator. We acted as general contractor for this project, which included civil, mechanical, structural, and architectural aspects. Specifically, the project required numerous plant upgrades and the scope of work included structural supply and erection, equipment foundation demolition and installation, mechanical…
Read MoreGreen Energy Project
JV Driver completed the installation of a 35 MW steam turbine and generator. The civil, concrete and mechanical scope included piers and pier caps, floor slabs with approximately 120 tons of rebar, steam piping and installation of an air condensing cooler, the generator and turbine. The project incorporated over 20,000 inches of pipe.
Read MoreTurbine and Generator
JV Driver completed the installation of a 35 MW steam turbine and generator. The civil, concrete and mechanical scope included piers and pier caps, floor slabs with approximately 120 tons of rebar, steam piping and installation of an air condensing cooler, the generator and turbine. The project incorporated over 20,000 inches of pipe.
Read MoreGrande Prairie GPEOP
We completed the installation of the 50MW Dresser Rand Turbo-generator for Weyerhaeuser. The scope of this project included all new foundations, site scaffolding, all piping (including mill tie-ins), a structural pipe-bridge and tower installation, as well as the mechanical installation of the 50 MW Turbo-generator. This work was later expanded to include the construction of…
Read MoreNabiye
JV Driver has completed the new steam-generation, bitumen-processing and water treatment facilities to support the In-Situ oil extraction process in Cold Lake. The power scope included 2 GE turbines, 2 HRSGs, 1 OTSG, field erected tanks and an Ecodyne Hot Lime Softener. We also executed other significant fabrication and construction scope.
Read MoreCarmon Creek
JV Driver was awarded the power scope for Carmon Creek Project – a vertical well steam drive facility that will produce up to 80,000 barrels per day of bitumen. The power scope is for the installation of 3,200+ MW gas turbine generators and 3 HRSG boilers for the steam injection system.