Skip to content

Alexandra

The construction of Alexandra, a 20 storey high-rise building located just steps away from English Bay and Stanley Park, began in May 2012. This Millennium/Concord Pacific venture is located in Vancouver’s original seaside neighbourhood and features an iconic architectural design with a revitalized heritage facade. Alexandra will be built to LEED Gold standards. This beautiful…

Read More

Riverport Flats

The construction of Riverport Flats began in November 2010.  The building was completed and occupancy granted as of January 24, 2012. This building is a continuation of Legacy Park Lands riverfront development at the east end of Steveston Highway. This 4 storey residential wood frame complex features 80 rental suites of various sizes ranging from…

Read More

Contact Centre

This project involved a complete renovation of a 20 year old building consisting of 25,400 ft2 on two floors located in downtown Prince George. Some key construction elements included: Extensive structural upgrade to existing core concrete structure Complete removal of existing mechanical system and new high efficiency mechanical system operating at 97% efficiency. All mechanical…

Read More

The Ultra

Located just minutes from Central City (near City of Surrey’s emerging development of a new City Centre) and within walking distance to amenities, major bus loop  and skytrain. The modern 40 story concrete high rise features 362 units nestled on 3.5 levels of underground parking plus 11 – 2 story detached wood frame townhouses. Units range…

Read More

CNC Education Centre

Construction of LEED Gold, 67,000ft2 Trade Technical Centre. Project consists of approximately 32,000 ft2 of two storey classroom and administration and 35,000ft2 of shop/trade teaching area. Project is conventional structure steel superstructure with high performance building envelope consisting of Masonry, Zinc Cladding, Translucent Glazing System, Curtain Wall and Polycarbonate Panel Assemblies. Other features include geothermal…

Read More

BioEnergy Project

Construction Management At Risk for the construction of two separate but integrated projects. One of the projects is a LEED Gold BioEnergy Building. The BioEnergy Building will house the bioenergy equipment supplied by Nexterra. Nexterra’s equipment converts wood waste into syngas burned in the boilers that are used to heat the entire UNBC facility. The…

Read More

Olympic Village

Long after the medals have been awarded and the athletes, officials and fans have left the 2010 Olympic and Paralympic Winter Games, the mixed-use development known as the Olympic Village will remain as one of Vancouver’s largest and most diverse mixed-use developments. Developed by The Millennium Group, the village will be home to approximately 2,800…

Read More
Scroll To Top