Skip to content

Kearl Lake

JV Driver completed the Structural and Mechanical erection of the Slurry Prep Plant and the OPP Conveyor System for the Crusher and Surge Bin at Imperial Oil’s Kearl Lake facility. The 4 story structure is a 64,200 square foot plant with a 0.7 km conveyor line. JV Driver’s scope included piping, mechanical, civil and structural…

Read More

Devon Jackfish

JV Driver completed the Jackfish project, a 35,000 barrel-per-day SAGD. We were responsible for the entire scope of construction and self-performed all but the electrical and instrumentation. This work included all civil foundations and structural work required in the erection of the structures. In addition, JV Driver executed all work in the piping and mechanical scope,…

Read More

Nabiye

JV Driver completed the new steam-generation, bitumen-processing and water treatment facilities to support the In-Situ oil extraction process in Cold Lake. JVD’s scope of work included earthworks, foundations, structural, piping, mechanical, modules, pipe and steel fabrication. The mechanical equipment being used included 2 GE turbines, 2 HRSGs, 1 OTSG, field-erected tanks and an Ecodyne Hot…

Read More

Carmon Creek

We are currently constructing the Carmon Creek Project – a vertical well steam drive facility that will produce up to 80,000 barrels per day of bitumen (12,600 cubic meters). The scope includes all Civil, Structural, Mechanical, Piping Electrical and Instrumentation with constructability and workface planning already in progress. The project also involved the installation of…

Read More

Shell Albian Sands

JV Driver completed the AOSP Expansion project, this was a 4 billion dollar expansion of the existing Shell Albian facility. It included the Jackpine Mine, new extraction, tailings, froth and utilities facilities. Phase 1 ran from Q3 2006 to Q2 2010. We were the General Contractor for the extraction and tailings portion of this project and…

Read More

Hangingstone

JV Driver successfully completed constructing the Hangingstone SAGD expansion for JACOS. The scope of this project includes steel and pipe fabrication, module construction and site construction and installation. The site construction includes all Civil, Structural, Mechanical, Piping, Electrical and Instrumentation.

Read More

Horizon Extraction

JV Driver completed the CNRL Extraction Plant which consisted of 2 primary separation cells, flotation cells, 20 pipe rack modules, hot water facility, electrical substation, and emergency dump sump. We were involved in this project from the early stages of development providing constructability support, labour strategies and construction services. Our scope was as the general contractor,…

Read More